In The Case Of Call For Tender
- Analyse the complete scope of work and clearly identify objectives of the discipline and internal / external interfaces
- Analyse the technical documents (specifications, calculation notes, drawings, etc.) in order to assess the scope of the studies required and the potential risks
- Set up and issue the necessary clarification requests during the proposal phase as well as the qualifications included in the bid
- Seek as far as possible solutions which can improve overall competiveness
- Estimate quantities or validate estimation done by other specialists of the team
- Estimate the budget required for the studies completion
- Set up the schedule of the execution studies and the associated plan for resources mobilization
In The Case Of Project Execution
Analyse the complete scope of work and clearly identifies objectives of the discipline and internal / external interfacesAnalyse the project technical documents in order to validate consistency between the budget, resources and means allocated for the work completion and the targets to be metMake the Technical Manager aware of the modifications or anticipated difficulties for meeting Client requirementsIdentify project hot spots, criticalities and activity prioritiesOrganize the work of the team and write the project procedures for the execution and control of the structural studiesDefine and follow-up the planning of resources mobilizationPrepare Project Design PremisesWrite or supervise the writing of the Structural Design Brief (the technical roadmap for the discipline engineering activities)Coordinate the engineering activities of the team members throughout the project with a permanent focus on optimization of quality, costs and schedule criteriaManage the different interfaces by coordinating the activities of the team with all the other stakeholders on the project (other engineering disciplines, project team, working sites, construction, installation, etc.)Control the input data for the team activities and check / review all the documents issued by the teamSupervise the writing of specifications and requisitions as well as technical bid evaluationsInform on a permanent basis the Technical Manager and if required the Project Manager of any foreseen technical or financial or delay riskDeal with Third Party Authority when the certification process of offshore structure design is requiredDeal with Marine Warranty Surveyor in the ambit of the surveying process of marine operationsProvide weight and cog data to weight control engineerFeed the Offshore Structural Department improvement system by reverting the lessons learned during the project#J-18808-Ljbffr