Responsibilities
Supervise the installation of Air Conditioning Works installation and insulation work for duct and, all chilled water works. installation of FCU (Fan Coil Units) and AHU (Air Handling Units). installation primary and secondary pumps of chilled water. Monitor the installation of firefighting works (all size of pipes, Water Sprinklers, Fire Pumps) Ensure the installation of plumping & drainage works (installation all size of pipes and accessories). Control the installation of BMS works (to make coordination between all mechanical and electrical works at operation. Assess project needs, and materials needed for the project Make the necessary tests and measurements to hand over the work to the consultant Prepare the reports and receipt the works from the subcontractors and make invoices for them. Work with the engineers of other departments and coordinating with them during the project implementation period to avoid any errors. Required Skills
Basic Project Management Skills. Effective communication skills. Team management and leadership skills. Problem-solving skills. Strong analytical skill and attention to details. Strong in MS Office. Education
Bachelor's degree in Mechanical Engineering. Experience
5-9 years of experience / HV projects with Saudi Electricity Company (SEC) Location
Different Locations in Saudi Arabia.
#J-18808-Ljbffr
Site Engineer • Jeddah, Saudi Arabia